Lean Journey

Lean is how we guarantee quality.

We remove what the customer does not need: waiting, lifting, moving and rework. What is left is a shorter, calmer line that makes a better ball.

A polished NHB steel ball
What lean means here

Three habits, every shift.

Lean is not a project at NHB. It is the way the plants are run.

A clean, straight line on the NHB shop floor
01

Take out the waste

If a step adds no value for the customer, we shorten it or remove it. SARAL, the name of our line concept, means simple and straight.

A process-control monitor on a machine at NHB
02

Build quality in

Controls sit inside each process, so a problem is caught where it starts. Balls pass through automatic scanners before packing.

A team studying a machine together on the shop floor
03

Let people improve the work

The people who run a machine know where it slows down. They test their own ideas and change the line.

The journey

Decades of small steps.

From ground balls to one connected lean line.

  1. The NHB plant at Amalsad seen from the air
    1980

    Ground balls

    NHB begins making ground balls.

  2. Steel balls pouring out of a machine at NHB
    2004

    Grade G10

    A finer ball for bearing makers.

  3. A lapping machine on the NHB shop floor
    2007

    G10Q balls

    A further step within the G10 grade.

  4. The inspection room on the NHB shop floor
    2011

    Grade G5

    The grade used in demanding bearings.

  5. A SARAL channel on the NHB shop floor
    2015

    Premium and SARAL

    Zero-defect thinking and a simple, straight line.

  6. Machine CF-3 in a newer hall at NHB
    2016

    Eight new channels

    Eight new production channels are added.

  7. A labelled bin of balls moving between two steps of a SARAL channel
    2017

    Electronic Kanban

    Customer demand triggers production directly.

  8. NHB receiving the Schaeffler India Supplier of the Year award
    2018

    Customer recognition

    Supplier of the Year from Schaeffler India. Quality award from SKF India.

  9. The lean layout kaizen team on the shop floor
    2025

    Lean line layout

    The SARAL line is rebuilt as one connected lean line.

Results, 2012 to 2018

What changed for customers.

Faster through the plant, fewer complaints, more deliveries on time.

Time through the plant
213days

Throughput time, wire to packed ball.

Work waiting in the plant
3217days

Work in progress, nearly halved.

Output per person
5.613kg an hour

Productivity more than doubled.

Customer complaints
1329a year

Fewer problems reaching customers.

On-time delivery
62%85%

After electronic Kanban linked demand to the line.

Management layers
73layers

Decisions reach the shop floor faster.

Source: NHB company presentation, September 2019.

The lean line

“We just did the impossible.”

The team rebuilt a batch line into one connected lean line. Balls now pass from one operation to the next with a single touch. No crane, no lifting, no elevator.

The lean layout kaizen team on the NHB shop floor
The lean layout kaizen team.
MeasureBatch lineLean lineChange
Lead time for a lot2 to 3 daysUnder 24 hours50% less
Length of the line50 to 60 mAbout 12 m80% shorter
Floor area250 m²81 m²68% less
Inventory71% less
Output35% more
Capacity38% more
Ball transferCrane and lifting, many touchesOne touchNo crane
The Moonshine workshop

Think with your hands.

Moonshine is our managed way to generate, test and refine ideas. Teams build a quick mock-up, try it, and keep what works.

One machine, studied closely

Heading machine NH-141.

A field study followed one machine from July 2019 to March 2020. Staging the next wire coil early cut the changeover.

Wire-change setup
4117minutes

The next coil is ready before the last one ends.

Equipment effectiveness
60%83%

Availability, performance and quality combined.

Source: published field study, 2020.